Omaha, NE.
Building Material: Basement walls are reinforced concrete. First, second and third floors are post tensioned concrete flat slabs. The third level post-tensioned concrete flat plate is a transfer level supporting 4 floors of Type III wood framed construction. Level 3-6 and the roof will be load bearing wood framing with wood trusses.
Size: 7-story hotel with approximately 121,708sf
Architect: River Street Architecture
Construction to be completed in 2024.